Buy Options

  • MC68HC908QY2MDTE
    935319019574
  • Not Recommended for New Designs
  • TUBE-Tube in Drypack
    Min. Package Quantity: 96
    Lead Time: 10 weeks
    • Distributor
    • .

Operating Characteristics

Parameter Value
Description

Quality Information

Material Declaration Safe Assure Functional Safety Moisture Sensitivity Level (MSL) Peak Package Body Temperature (PPT) (C°) Maximum Time at Peak Temperatures (s)
Lead Free Soldering Lead Free Soldering Lead Free Soldering
40

Shipping Information

Part Number Harmonized Tariff (US) Disclaimer Export Control Classification Number (US)