Buy Options

  • K912DT12PE2VPVER
    935314526578
  • Not Recommended for New Designs
  • REEL-Reel 13" Q2/T3 in Drypack, SmallPack
    Min. Package Quantity: 100
    Lead Time: 10 weeks
  • 10K @ US $25.35
  • S912DT12PE2VPVER
    935314525528
  • Not Recommended for New Designs
  • REEL-Reel 13" Q2/T3 in Drypack
    Min. Package Quantity: 500
    Lead Time: 10 weeks
    • Distributor
    • .
    • Similar Samples

Operating Characteristics

Parameter Value
Description

Quality Information

Material Declaration Safe Assure Functional Safety Moisture Sensitivity Level (MSL) Peak Package Body Temperature (PPT) (C°) Maximum Time at Peak Temperatures (s)
Lead Free Soldering Lead Free Soldering Lead Free Soldering
40
40